The weather hasn't helped over the last couple of weeks.
The foundations are just about ready for pouring the slab.
After the scalpings and bindings to fill the foundations, the Radon Barrier (Red Plastic Sheet) has been laid, drains brought up through it and a course of blockwork laid on top, ready for the floor to be poured.
The large double garage has also progressed well. It's of cavity construction and now up to shoulder level. The builder is hoping to power-float the floor next week.