We've moved in and, apart from a small snagging list, everything is finished.
The result is more than we expected - the finish is outstanding!
The Hall & Staircase
Friday, 30 October 2009
Sunday, 30 August 2009
Saturday, 11 July 2009
Nearly There!
It's quite a while since I last updated this.
We had hoped to be in by now but it looks like it could be another 6 to 8 weeks.
Things have progressed well and the outside of the house is just about finished.

The garage is now completed.

Patio and paths have been laid.


Inside has been painted and only needs a final coat to finish it off.
Underfloor heating has been installed and the screed poured.
The second fix electrics is well under way.

We had hoped to be in by now but it looks like it could be another 6 to 8 weeks.
Things have progressed well and the outside of the house is just about finished.
The garage is now completed.
Patio and paths have been laid.
Inside has been painted and only needs a final coat to finish it off.
Underfloor heating has been installed and the screed poured.
The second fix electrics is well under way.
We need to wait another 2 or 3 weeks for the screed to dry fully before the tiles and oak flooring can be laid.
Shower trays are in and the second fix plumbing is about to be started.
Friday, 3 April 2009
Progress
Most of the stud walls on the first floor are now in place and a lot of the ground floor ceilings have had the plasterboard fitted
Most of the first fix plumbing has also been completed
Sunday, 1 March 2009
Sunday, 1 February 2009
Windows
Despite the recent wind & rain and the Christmas break, things have progressed well.
The roof has had the felt & battens fitted and the majority of the windows are now glazed and installed.
The electrician has been on site and the first fix electrical work has started. Once the internal first floor walls are constructed, the first fix can be finished.