The footings have been dug and poured for the detached double garage.
Today work has started on setting out the drains for both the sewerage - for connection to the sewer main and, the rainwater which will run to a soakaway at the bottom of the rear garden.
Weather permitting these will be finished tomorrow and, once inspected, the slab can be poured.
1 comment:
Its looking good Chris, the slab will look tiny.. ours did hehe!!